One of the most common questions we hear before a bathroom renovation starts is simply: what actually happens, and when? Having a realistic week-by-week picture makes the process far less stressful, especially if it is your only bathroom and you are trying to plan around it.
Week 1: Demolition and Assessment
Old fixtures, tile, and in some cases drywall come out. This is also when we get a real look at what is behind the walls, including the condition of existing plumbing and any signs of water damage that were not visible before.
Week 2: Plumbing and Electrical Rough-In
Any fixture relocation, new circuits for lighting or heated floors, and exhaust fan upgrades happen at this stage, before anything gets closed up behind drywall.
Week 3: Waterproofing, Tile, and Inspections
Waterproofing in showers and wet areas happens first, then a curing period, followed by tile installation. This stage takes the longest of the four, because tile work cannot be rushed without risking the finished result.
Week 4: Fixtures, Vanity, and Finishing Touches
Vanity, toilet, fixtures, mirror, and final touch-ups go in, followed by a final walkthrough with you before the project is called complete.
What Can Extend the Timeline
- Water damage discovered once walls are opened
- Custom tile, vanity, or fixture lead times
- Layout changes decided mid-project rather than at the design stage
How to Help Your Project Stay on Schedule
Finalize your tile, fixtures, and finishes before demolition starts, rather than deciding partway through. The earlier these decisions are locked in, the fewer delays waiting on materials to arrive.
Frequently Asked Questions
Q: How long does a standard bathroom renovation take?
A: Most standard bathroom renovations take 2 to 4 weeks. A full ensuite rebuild with layout changes can take 4 to 6 weeks.
Q: Can I use my bathroom during the renovation?
A: If it is your only bathroom, we will talk through options at your consultation, since most of the renovation does require the space to be out of use.
Q: What’s the most common cause of delay?
A: Discovering water damage once walls are opened, and waiting on custom material lead times.
Q: When do I need to choose my fixtures and tile?
A: Ideally before demolition starts. Locking in these decisions early keeps your project on schedule.